El Mirador De La Heredia Update: July 2008
The club house construction is now complete with interior fittings being finalised.
The terracing of land for the upper level of the development is now underway.
With land at the lower level now extracted.
The early construction of the perimeter wall now shows the outline of the site, once complete the perimeter wall will be finished in Casares Rock.
